Bottom connections
Intake nozzles PS/30, PS/50 and PU/30
The installation of intake nozzles can result in a pressure loss reduction of up to 10 Pa depending on the fan. They are easy to bond with the pipe system due to the slot and key connection. DLG approved.
Water collecting basin
The water collecting basin is recommended for the collection of penetrating water. The basin is fitted beneath the chimney.
Downloads
Infosheet Download